Putian Frozen Water Renovation
● This project involves converting the existing propylene glycol pipeline, which was previously used for unpacking, into a chilled water pipeline.
● Install the chiller unit, circulating water pump, control cabinet, and cooling tower in a modular, split configuration.
● For this project, we’re also using a modular prefabrication approach in the warehouse, followed by on-site assembly.
● After the project was completed, the risk of accidental leakage of food during the production process was significantly reduced.
CONTACT US
Service Hotline
+86 186 2778 4520
Email: haitai@wuhanht.com
Address: Building 1, 2nd Floor, Wuhan Design Plaza, Taizi Lake North Road, Wuhan Economic Development Zone
MessageCopyright © Wuhan Haitai Mechanical&Electrical Development Co., Ltd. All Rights Reserved.
Phone:
Email:
Message:
导航下拉添加类名.active
在线客服添加返回顶部
右侧在线客服样式 1,2,3 1
图片alt标题设置: Haitai Mechanical&Electrical
表单验证提示文本: The content cannot be empty!
CSS / JS 文件放置地