2024 Ziyang Ultra-High-End Expansion Project – Refrigeration Expansion Project
● The Ziyang Refrigeration Expansion Project is an EPC turnkey project.
● This project includes 6 refrigerant water pumps, a refrigerant water storage tank with a capacity of 150 m³, a modular refrigerant water plate heat exchanger unit with a cooling capacity of 2,200 kW, and a refrigerant ultrafiltration system along with associated pipelines and valves.
● All carbon steel pipelines in the project are treated with pickling and passivation for corrosion protection. The project involves inspection and testing of pressure vessels and pressure pipelines, as well as non-destructive testing of pressure pipelines.
● The project involves work such as shutdown and connection, system pressure testing, purging, vacuuming, and leak-testing and commissioning;
● After the project was completed and put into operation, the cooling capacity was increased, meeting the production requirements of the entire expansion project.
CONTACT US
Service Hotline
+86 186 2778 4520
Email: haitai@wuhanht.com
Address: Building 1, 2nd Floor, Wuhan Design Plaza, Taizi Lake North Road, Wuhan Economic Development Zone
MessageCopyright © Wuhan Haitai Mechanical&Electrical Development Co., Ltd. All Rights Reserved.
Phone:
Email:
Message:
导航下拉添加类名.active
在线客服添加返回顶部
右侧在线客服样式 1,2,3 1
图片alt标题设置: Haitai Mechanical&Electrical
表单验证提示文本: The content cannot be empty!
CSS / JS 文件放置地